Manufacturing
Manufacturing continuity
Design, prototype and production stay in one PARAMILI process, so a defence system reaches certification without a broken chain.
1 min readUpdated
PARAMILI treats manufacturing as one file. The requirement, the prototype and the production standard are held by the same structure, from the first drawing to the record that travels with the system.
Where a chain usually breaks
A break appears at a boundary. The drawing is finished, a new supplier takes the file, and the field standard was never written down. Continuity means those boundaries stay inside one mandate instead of being handed across a table.
- Platform design and the prototype stay attached to the production standard.
- Certification is planned with the build, not opened after the first article is complete.
- Delivery includes the record the field needs to keep the system in service.
This note describes that way of working. It is not a catalogue of systems, and it does not replace a direct request to the company.
